Contract\ Consumers Power/City of Allega Patricia Miner posted 3 months ago
I just picked up the Contract between the City of Allegan and Consumers Power Company. Just to let you know. I will look through it, but because of all the legal language I would like to let someone with a "legal" opinion or "engineering" opinion view the document.
Thank you Patricia. Look forward to hearing the synopsis. cz Carol Zigulich commented 3 months ago I have read through the document a few times and I'm afraid I need someone with legal opinion, engineering, and surveying knowledge to review all the pages. I found this rather interesting. ......the Company (C.P.) will maintain and operate said hydroelectric plant so that the pond thereof (i.e., Lake Allegan) will be maintained at a level not lower than elevation 615.0, USGS Datum, and not higher than elevation 618.0, U.s.g.s. Datum, subject, however, to fluctuations due to rainfall, weather, and normal operations and to the right to lower the level of said pond temporarily for the purpose of maintaining, repairing, extending, enlarging or otherwise working upon said hydroelectric plant or any part thereof. There are 29 pages of contract and description... But, this might be something we can use. Patricia Miner commented 3 months ago Pat, did you retrieve it in hard copy, or is there a pdf download available somewhere? I'd like to read this document if possible. Carol Doeringer commented 3 months ago i believe Ken Yonker is familiar with this document. also Bill Chaney's group could assist. Katherine Dwyer commented 3 months ago